DOWNLOAD
- MSIL Resilience - cablelink
- Briefing C21-PG-013 - proposal on using the Openreach Cablelink product in the MSIL resilience offering
(115 KB)- 20/08/2009
- MSIL Resilience Condoc Closure
- Briefing C21-PG-010 MSIL Resilience closure condoc. Closing date for any customer responses to this document is the 15 July 09. Annex A form for all replies please. Note: as no responses were received this consultation is now considered closed as of August 09
(121 KB)- 01/07/2009
- IPstream workshop 21st May 2009
- Zip file with material used for a workshop held on migrating from IPstream to 21CN Broadband. Output slides now added
(1.2 MB)- 01/06/2009
- WBC roll out maps
- WBC rollout maps which cover the 549 exchanges enabled to the end of March 2009
(567 KB)- 22/05/2009
- MSIL Service Resilience Condoc
- C21-PG-007 MSIL Service Resilience condoc and Annex response form in a zipfile. Responses should be returned by 17th April 09
(118 KB)- 27/03/2009
- IPstream sunsetting - consultation closure
- Briefing C21-PG-002, Consultation closure (replaces earlier Summary of Responses) Briefing for the IPstream sunsetting Phase 2: Overall Framework & Stage 1 for Withdrawal of BT Centrals
(434 KB)- 20/02/2009
- Datastream retirement
- Briefing C21-PG-005, Datastream retirement: Options for cessation of new supply
(142 KB)- 20/01/2009
- Resilience workshop 24th November 08
- Zip file with briefing for the workshop and presentation material. Updated version of Handover Resilience Workshop slides loaded.
(1.1 MB)- 17/12/2008
- wCC workshop 5th November 08
- Zip file with agenda for a Wholesale Content Converged product workshop. Slides now added. Notes now added
(1.1 MB)- 17/11/2008