DOWNLOAD
- PSTN Emulation meeting - 041006
- Zip file initally loaded with the agenda for the meeting on 4th October 06 and spreadsheets modelling the Charging Options – Availability of Lower Blended Rate from Metronodes (now v2) and details of the TDM (BT Switch) Site to Metronode association. Also contains notes from conf call held on 25/09/06. Also loaded with slides to be used on the day. Now loaded with the meeting notes.
(772 KB)- 26/10/2006
- PSTN Emulation Workshop
- The revised invitation to the PSTN Emulation Workshop which is on 30th August and slides containing CP reponses to two charging methodolgies. Also now with additional presentations from BT & C&W. Notes loaded 11/09/06
(727 KB)- 11/09/2006
- NGN Fease workshop invite for 13/06/06
- This invite is for a workshop to discuss new areas of complexity that may arise during the feasibility and development phases of BT`s proposed PSTN emulation product.
(873 KB)- 19/06/2006